首页> 外文会议>Geothermal 2011;Geothermal Resources Council annual meeting >Use of Wellbore Simulation as a Tool to Evaluate Well Issues in Mature Geothermal Fields
【24h】

Use of Wellbore Simulation as a Tool to Evaluate Well Issues in Mature Geothermal Fields

机译:使用井眼模拟作为评估成熟地热田中井问题的工具

获取原文

摘要

The Tiwi and Mak-Ban Geothermal Fields in the Philippines have been on commercial production for over 30 years and are considered to be "mature" assets in terms of their commercial development. This paper discusses how Chevron Geothermal uses wellbore simulation to add quantitative analyses to conceptual well models in order to justify wellwork. "GeoFlow", a software developed in-house, is introduced as the tool used for simulation. The simulation process, from data requirements to the correlations used, is briefly noted. Four specific examples, Kap-29, Nag-20, Bul-65, and Bul-01 are discussed. Wellbore simulation enabled the company to estimate steam production addition from Kap-29 and Bul-01, and thus approve their workovers. Nag-20 is projected to be a good candidate for an injection well. Bul-65's workover, on the other hand, was postponed due to findings from the simulation. The case of Bul-01 also highlights the criticality of a robust and truthful conceptual well model as a requirement before proceeding with wellbore simulation, as simulation results are not unique and changing wellhead conditions can be the result of more than one subsurface process.
机译:菲律宾的Tiwi和Mak-Ban地热田已经商业化生产了30多年,就其商业发展而言,它们被视为“成熟”资产。本文讨论了雪佛龙公司地热如何利用井眼模拟将定量分析添加到概念性井模型中,以证明井井作业的合理性。引入内部开发的软件“ GeoFlow”作为用于仿真的工具。简要说明了从数据需求到所使用的相关性的仿真过程。讨论了四个具体的例子,Kap-29,Nag-20,Bul-65和Bul-01。井筒模拟使该公司能够估算Kap-29和Bul-01的蒸汽产量,从而批准其修井作业。 Nag-20预计将成为注入井的良好候选者。另一方面,由于模拟的结果,Bul-65的维修工作被推迟了。 Bul-01的案例还强调了稳健而真实的概念井模型在进行井眼模拟之前的重要性,因为模拟结果不是唯一的,并且井口条件的变化可能是一个以上地下过程的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号