首页> 外文会议>International conference on engineering and information management >Study on Heuristic Grid Workflow Scheduling Algorithm Based on Deadline
【24h】

Study on Heuristic Grid Workflow Scheduling Algorithm Based on Deadline

机译:基于截止日期的启发式网格工作流程调度算法研究

获取原文

摘要

In grid technology, the scheduling algorithm is a spot in many research field. At present, the main work of the schedule algorithm is centered on how to optimize the scheduling of the task to minimize the implementation time of the whole workflow and ignore the grid resource failure and the impact on the grid application program. This essay introduces user behaviors of user-specific quality of service and then takes the quality of service of the deadline as an example and proposes a scheduling algorithm of grid workflow based on deadline heuristic. This scheduling algorithm can not only complete the application program before user's required deadline but also can maximize the survivabiliry of the whole application program. At last, the purpose that not only the application program can be completed before deadline but also the survivabiliry can be maintained at a relatively high level can be reached.
机译:在网格技术中,调度算法是许多研究领域的斑点。目前,计划算法的主要工作是如何优化任务的调度,以最大限度地减少整个工作流的实现时间,并忽略网格资源故障和对网格应用程序的影响。本文介绍了用户特定的服务质量的用户行为,然后将截止日期的服务质量为例,并提出了一种基于截止日期启发式的网格工作流程的调度算法。此调度算法不仅可以在用户所需的截止日期之前完成应用程序,但也可以最大限度地提高整个应用程序的SurvivabiLifiLiry。最后,不仅可以在截止日期之前完成应用程序的目的,而且可以达到幸存者可以保持幸存者可以保持在相对较高的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号