首页> 外文会议>International conference on computer design and applications >Simulation Analysis on Influence of Redundant Time in Train Rescheduling in Passenger Dedicated Lines
【24h】

Simulation Analysis on Influence of Redundant Time in Train Rescheduling in Passenger Dedicated Lines

机译:乘客专用线路乘火车重新安排冗余时间影响的仿真分析

获取原文

摘要

Redundant time plays an important role in timetable construction and train rescheduling. There are several types of redundant time. Different type and different value of redundant time will bring various influences on train rescheduling. The paper focused on two types of them: recovery time and buffer time and analyzed their influences by simulation. It analyzed common train rescheduling strategies firstly. Then different values of buffer time and recovery time were used and various strategies were also applied in the experiments to analyze the influences of redundant time on train rescheduling.
机译:冗余时间在时间​​表建筑和火车重新安排中起着重要作用。有几种类型的冗余时间。冗余时间的不同类型和不同的价值将为火车重新安排带来各种影响。本文集中于它们的两种类型:恢复时间和缓冲时间并通过模拟分析它们的影响。它首先分析了普通火车重新安排策略。然后使用不同的缓冲时间和恢复时间的值,并且还应用各种策略在实验中分析了冗余时间对火车重新安排的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号