首页> 外文会议>2011 IEEE Symposium on Computational Intelligence Applications In Smart Grid >Optimal phasor measurement unit placement for power system observability — A heuristic approach
【24h】

Optimal phasor measurement unit placement for power system observability — A heuristic approach

机译:电力系统可观测性的最佳相量测量单元放置—启发式方法

获取原文

摘要

In this paper a heuristics based method is proposed for optimal phasor measurement unit (PMU) placement in a power system. The objective is to determine the strategic locations for PMUs so that the power system is made completely observable with minimum number of PMUs. Zero injection buses are considered as virtual measurements in the proposed method. The optimal phasor measurement unit placement problem (OPPP) is solved using simple heuristics and network connectivity information. Simulation results for IEEE 14-bus, 24-bus, 30-bus, 57-bus, 118-bus and New England 39bus test system are presented and compared with the existing techniques. The results show that the proposed method is simple to implement and compares well with the other existing methods.
机译:本文提出了一种基于启发式的方法,用于电力系统中的最佳相量测量单元(PMU)放置。目的是确定PMU的战略位置,以便用最少的PMU就能完全观察到电源系统。在所提出的方法中,零注入总线被视为虚拟测量。使用简单的启发式方法和网络连接信息即可解决最佳相量测量单元放置问题(OPPP)。给出了IEEE 14总线,24总线,30总线,57总线,118总线和New England 39总线测试系统的仿真结果,并与现有技术进行了比较。结果表明,所提出的方法易于实现,并且与其他现有方法相比具有很好的可比性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号