首页> 外文会议>IEEE Symposium on Computational Intelligence Applications In Smart Grid >Optimal phasor measurement unit placement for power system observability — A heuristic approach
【24h】

Optimal phasor measurement unit placement for power system observability — A heuristic approach

机译:电力系统可观测性的最佳相量测量单元放置 - 一种启发式方法

获取原文

摘要

In this paper a heuristics based method is proposed for optimal phasor measurement unit (PMU) placement in a power system. The objective is to determine the strategic locations for PMUs so that the power system is made completely observable with minimum number of PMUs. Zero injection buses are considered as virtual measurements in the proposed method. The optimal phasor measurement unit placement problem (OPPP) is solved using simple heuristics and network connectivity information. Simulation results for IEEE 14-bus, 24-bus, 30-bus, 57-bus, 118-bus and New England 39bus test system are presented and compared with the existing techniques. The results show that the proposed method is simple to implement and compares well with the other existing methods.
机译:本文提出了一种基于启发式的方法,用于电力系统中的最佳相量测量单元(PMU)放置。 目标是确定PMU的战略位置,以便通过最小数量的PMU完全可观察到电力系统。 零喷射总线被认为是所提出的方法中的虚拟测量。 使用简单的启发式信息和网络连接信息来解决最佳相量测量单元放置问题(OPPP)。 仿真结果为IEEE 14公交车,24辆公共汽车,30公交车,57辆公交车,118公交车和新英格兰39Bus测试系统,并与现有技术进行了比较。 结果表明,该方法易于实现和比较其他现有方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号