The Seattle Department of Transportation (SDOT) is constructing a new two-lane eastbound off-ramp from the South Spokane Street Viaduct (SSSV) to 4th Avenue South near downtown Seattle. The ramp project encompasses a length of six (6) city blocks and includes surface street improvements. This paper presents the parameters and methodology used in an Alternatives Selection Worship for this 9-span tapering cast-in-place concrete t-beam and 5-span continuous post-tensioned cast-in-place concrete box girder ramp. Although the project originally required complete separation between the existing viaduct (circa 1941) and new ramp structure, also included herein is an overview of the seismic analysis performed to determine impacts of a closure slab. The post-tensioned concrete box girder portion of the bridge has an unbalanced span arrangement governed by cross-street geometry. The box girder is on a tight 56 meter minimum radius horizontal curve requiring special design methodologies that are also included. The engineer's estimate was $19.5M.
机译:西雅图交通运输部(SDOT)正在从南斯波坎街高架桥(SSSV)到西​​雅图市中心附近的第四大道南建设一条新的两车道东行匝道。坡道项目包括六(6)个城市街区的长度,并包括地面街道的改善。本文介绍了这种9跨度锥形现浇混凝土T型梁和5跨度连续后张现浇混凝土箱形梁坡道的“替代选择崇拜”中使用的参数和方法。尽管该项目最初要求在现有高架桥(大约在1941年)和新的匝道结构之间进行完全隔离,但本文还包括为确定封闭板的影响而进行的地震分析的概述。桥梁的后张预应力混凝土箱梁部分具有不平衡的跨度布置,该布置受横过马路的几何形状支配。箱形梁在最小半径为56米的狭窄水平曲线上,还需要采用特殊的设计方法。工程师的估计价值为1,950万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号