首页> 外文会议>International low impact development conference >LID in a Canadian Residential Brownfield Re-Development
【24h】

LID in a Canadian Residential Brownfield Re-Development

机译:LID在加拿大住宅布朗菲尔德再开发项目中

获取原文

摘要

The release rates from the Currie Barracks Phase 1 re-development (brownfield site into a medium density residential site) in Calgary, Alberta are required to match pre-development flows. In order achieve these release rates AMEC developed a Low Impact Design (LID) approach to stormwater management. Some of the key issues that AMEC resolved throughout this process were the impacts of the unique climate dominated by freeze-thaw events during winter months and the impacts of freezing on infiltration facilities.
机译:需要与艾伯塔省卡尔加里的Currie军营第一阶段重新开发(从棕地场地变为中密度住宅场地)的释放速率相匹配,以适应开发前的流量。为了达到这些释放率,AMEC开发了一种低影响设计(LID)的雨水管理方法。 AMEC在此过程中解决的一些关键问题是独特的气候所产生的影响,冬季以冻融事件为主,以及冻结对渗透设施的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号