首页> 外文会议>International low impact development conference >LID in a Canadian Residential Brownfield Re-Development
【24h】

LID in a Canadian Residential Brownfield Re-Development

机译:盖在加拿大住宅棕色菲尔德重新开发

获取原文

摘要

The release rates from the Currie Barracks Phase 1 re-development (brownfield site into a medium density residential site) in Calgary, Alberta are required to match pre-development flows. In order achieve these release rates AMEC developed a Low Impact Design (LID) approach to stormwater management. Some of the key issues that AMEC resolved throughout this process were the impacts of the unique climate dominated by freeze-thaw events during winter months and the impacts of freezing on infiltration facilities.
机译:艾伯塔省Currie Barrachs第1阶段1重新开发(Brownfield站点棕色田地遗址Brownfield Site)的释放率是匹配预开发流的。为了实现这些释放速率,AMEC开发出雨水管理的低影响设计(盖子)方法。 AMEC在整个过程中解决的一些关键问题是冬季冻融事件中独特气候的影响以及冻结渗透设施的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号