INTEGRATION OF PIPELINE SPECIFICATIONS, MATERIAL, AND CONSTRUCTION DATA-A CASE STUDY

机译:管道规格,材料和施工数据的整合-案例研究

获取原文

摘要

This paper introduces the concept of a Pipe Data Log (Pipe Log). The idea is not new but a Pipe Log is rarely created for new pipeline projects. A Pipe Log is frequently created as part of the post-construction process and is intended for Integrity purposes. However, creating and populating the Pipe Log as construction proceeds can provide multiple benefits:• Progress of all aspects of construction can be tracked.• Anomalies in data received can be identified immediately and rectified before the project proceeds.• Missing information can be captured before the project is completed and crews are demobilized.• The field engineer can compare with design to verify that the project is being constructed as it was designed.• When construction is complete the Pipe Log will be as well.WorleyParsons Canada Services Ltd., acting as Colt Engineering, worked on behalf of Enbridge Pipelines Inc. and created a detailed Pipe Data Log for the Canadian portion of the Southern Lights LSr Project. The Pipe Log was created using Microsoft® Excel with a line item for each individual piece of pipe that was welded in the pipeline. Information corresponding to the location of each pipe segment, welds performed, material, terrain, coating, protection, and testing was recorded.The Pipe Data Log is excellent for auditing data as the information is being entered. Information collected by the surveyor can be matched to that provided by the pipe mill and by weld and NDE inspectors. Missing or questionable information can be corrected during construction much easier than post-construction. At post-construction, the Pipe Log allows the Integrity team to quickly determine if there are otherareas of concern that have similar properties to another problem area.
机译:本文介绍了管道数据日志(Pipe Log)的概念。这个想法不是什么新主意,但是很少为新的管道项目创建管道日志。管道日志通常是在施工后过程中创建的,旨在用于完整性目的。但是,随着施工的进行创建并填充“管道日志”可以带来多种好处: •可以跟踪施工各个方面的进度。 •在项目进行之前,可以立即识别并纠正收到的数据异常。 •在项目完成和人员复员之前,可以捕获丢失的信息。 •现场工程师可以将其与设计进行比较,以验证该项目正在按设计进行建造。 •施工完成后,“管道日志”也将显示。 担任Colt Engineering的WorleyParsons Canada Services Ltd.代表Enbridge Pipelines Inc.工作,并为Southern Lights LSr项目的加拿大部分创建了详细的管道数据日志。管道日志是使用Microsoft®Excel创建的,每个管道中焊接的单个管道都有一个行项目。记录了与每个管段的位置,进行的焊接,材料,地形,涂层,保护和测试相对应的信息。 当输入信息时,管道数据日志非常适合审核数据。验船师收集的信息可以与钢管厂以及焊缝和NDE检验员提供的信息相匹配。与施工后相比,在施工过程中更容易纠正丢失或可疑的信息。在施工后,管道日志允许完整性团队快速确定是否还有其他问题。 具有与另一个问题区域相似的属性的关注区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号