首页> 外文会议>Association of State Dam Safety Officials annual conference >FINDING SOLUTIONS TO THE MANY POTENTIALLY CONFLICTING IMPLICATIONS OF DAM REMOVAL - TWO CASE STUDIES
【24h】

FINDING SOLUTIONS TO THE MANY POTENTIALLY CONFLICTING IMPLICATIONS OF DAM REMOVAL - TWO CASE STUDIES

机译:寻找解决方案到坝移除的许多潜在相互矛盾的影响 - 两种案例研究

获取原文

摘要

The Connecticut Department of Energy & Environmental Protection (DEEP) owns more than 250 dams. Financial resources to maintain these dams are increasingly difficult to obtain. The DEEP promotes ecological restoration and removal of dams to restore riparian habitat wherever possible. The DEEP recognizes that removing dams would stem funding shortfalls and help achieve ecological restoration goals. The DEEP undertook dam de-commissioning assessments to evaluate the feasibility of removing dams in two watersheds - the four Seymour Reservoir dams creating impoundments for a former potable water supply system, and the Sprinqborn Dam that formerly provided hydropower for a textile mill.
机译:康涅狄格能源与环保(深)拥有250多个水坝。维持这些大坝的财政资源越来越难以获得。深入促进生态修复和拆除水坝,尽可能恢复河岸栖息地。深刻认识到消除水坝会遏制资金不足,有助于实现生态恢复目标。 Deave的解除调试评估评估了两种流域拆除水坝的可行性 - 这四个Seymour水库水坝为前饮水供水系统产生了蓄水池,以及以前为纺织厂提供水电的Sprinqbonbon大坝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号