首页> 外文会议>Association of State Dam Safety Officials annual conference >FINDING SOLUTIONS TO THE MANY POTENTIALLY CONFLICTING IMPLICATIONS OF DAM REMOVAL - TWO CASE STUDIES
【24h】

FINDING SOLUTIONS TO THE MANY POTENTIALLY CONFLICTING IMPLICATIONS OF DAM REMOVAL - TWO CASE STUDIES

机译:找到许多可能导致水坝拆除的潜在冲突的解决方案-两种案例研究

获取原文

摘要

The Connecticut Department of Energy & Environmental Protection (DEEP) owns more than 250 dams. Financial resources to maintain these dams are increasingly difficult to obtain. The DEEP promotes ecological restoration and removal of dams to restore riparian habitat wherever possible. The DEEP recognizes that removing dams would stem funding shortfalls and help achieve ecological restoration goals. The DEEP undertook dam de-commissioning assessments to evaluate the feasibility of removing dams in two watersheds - the four Seymour Reservoir dams creating impoundments for a former potable water supply system, and the Sprinqborn Dam that formerly provided hydropower for a textile mill.
机译:康涅狄格州能源与环境保护部(DEEP)拥有250多个水坝。维护这些水坝的财政资源越来越难以获得。 DEEP促进了生态恢复和大坝的拆除,以尽可能恢复河岸栖息地。 DEEP认识到拆除大坝将阻止资金短缺,并有助于实现生态恢复目标。 DEEP进行了大坝退役评估,以评估在两个流域中拆除大坝的可行性-四个西摩水库大坝为以前的饮用水供应系统创建了蓄水库,斯普林格博恩大坝为纺织厂提供了水力发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号