EAST BRANCH DAM - 1957 INTERNAL EROSION INCIDENT

机译:东分公司 - 1957年内部侵蚀事件

获取原文

摘要

East Branch Dam is located in North-central Pennsylvania on a tributary of the Allegheny River. This zoned earth embankment dam is approximately 180 feet high and 1,700 feet long and is controlled by the Pittsburgh District of the U.S. Army Corps of Engineers. The dam is operated to prevent flooding in downstream communities and also to enhance water quality by helping control water temperatures downstream of Ridgway, PA, where a paper mill discharges warmer water into the stream. The dam was constructed in the mid-1950's. During a relatively moderate pool level that occurred after only a few years of operation, muddy water was observed flowing from a rock drain at the downstream toe of the dam. Emergency drilling through the embankment exposed a void at the base of the embankment near its contact with top of rock. This paper discusses the design and construction practices used at East Branch Dam, gives information related to the dam safety incident and emergency response, and theorizes about the possible causative mechanisms of internal erosion that nearly caused the dam to breach.
机译:东分公司位于Allgheny河的支流上宾夕法尼亚州北部北部宾夕法尼亚州。这个划分地球堤坝大坝约180英尺高,1700英尺长,由美国军队工程师的匹兹堡区控制。该大坝被操作以防止下游群落中的洪水洪水,并通过帮助Ridgway,PA下游的控制水温来提高水质,其中造纸厂将加热水中进入溪流。大坝是在1950年代中期建造的。在仅在仅几年的操作后发生的相对适度的池水平期间,观察到泥泞的水从大坝下游脚趾的岩石排水流动流动。紧急钻孔通过路堤暴露在堤坝底部的空隙附近与岩石的顶部接触。本文讨论了东部分支机大坝使用的设计和施工实践,提供了与大坝安全事件和应急响应有关的信息,并了解内部侵蚀可能的致病机制,几乎导致大坝违约。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号