An Optimization Model of Site Batch Plant Layout for Infrastructure Project

机译:基础设施项目场地批处理厂布局优化模型

获取原文

摘要

Construction site layout is crucial to any project and has a significant impact on the economy, quality, schedule, and other aspects of the project. Especially for infrastructure construction project, the layout planning of site temporary batch plant is one of the key factors for assessing on complexity scales and project performances. The poorer the site batch plant layout planning, the more increasing the project complexity (risks) and the greater the construction cost raised. Generally, the site batch plant layout problem has been solved through the experiences of site management team, using more or less sophisticated numerical model, but mostly the final decision made by the leader who responsible for the site management taking much more consideration of the design conditions and the site spatial constrained. Therefore, the site batch plant layout has always been considered in complying with maximization principles. That is, individual contractor is often required to build his own batch plants for servicing his own project only according to its contract clauses. This construction management strategy has caused to a large waste of resources and much low productivity of the operated plants. The purpose of this paper applies genetic algorithms and computing techniques to develop an optimal model in order to search an optimal solution to the site batch plant layout in the planning stage, and combine with the practical contracting strategies to design feasible construction management plan for enhancement of site management and improvement of concrete quality, as well as minimizing the total construction costs. The GA's model was developed and applied to specific project located in Taiwan. The usefulness of the model was proven through by the practical operation of the project.
机译:施工现场的布局对任何项目都至关重要,并且会对项目的经济性,质量,进度和其他方面产生重大影响。特别是对于基础设施建设项目,工地临时批处理厂的布局规划是评估复杂性规模和项目绩效的关键因素之一。现场批处理工厂布局规划越差,项目复杂性(风险)就越大,所筹集的建设成本也就越大。通常,通过使用或多或少复杂的数值模型,通过现场管理团队的经验来解决现场批处理工厂的布局问题,但是大多数情况下,负责现场管理的负责人做出的最终决定更多地考虑了设计条件。并且网站空间受到限制。因此,现场批处理厂的布局一直被认为符合最大化原则。即,通常要求个体承包商仅根据其合同条款来建造自己的批处理工厂以为自己的项目提供服务。这种施工管理策略已导致大量资源浪费,并且运营工厂的生产率大大降低。本文的目的是利用遗传算法和计算技术来开发一个最优模型,以在规划阶段寻找现场批处理工厂布局的最佳解决方案,并与实际的承包策略结合来设计可行的施工管理计划,以增强工程的质量。现场管理和改善混凝土质量,以及最大程度地减少总建筑成本。 GA的模型已开发并应用于台湾的特定项目。通过项目的实际操作证明了该模型的实用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号