首页> 外文会议>Technical conference of the North American Society for Trenchless Technology;Annual technical conference of the North American Society for Trenchless Technology >CONDITION ASSESSMENT AND PRIORITIZATION OF SANITARY SEWER REHABILITATION IMPROVEMENTS IN THE CITY OF MIAMI BEACH, FL
【24h】

CONDITION ASSESSMENT AND PRIORITIZATION OF SANITARY SEWER REHABILITATION IMPROVEMENTS IN THE CITY OF MIAMI BEACH, FL

机译:佛罗里达迈阿密海滩市的条件评估和优先进行的污水修复改造

获取原文

摘要

The City of Miami Beach, Florida, is a volume sewer customer (VSC) of Miami-Dade Water and Sewer Department (MDWASD). As such, the City must comply with the requirements set forth in Miami-Dade County's Volume Sewer Customer Ordinance (VSCO) 96-166. In order to satisfy one component of the VSCO, the City completed the Sanitary Sewer Evaluation Survey (SSES). The SSES project is comprised of several phases, including Phase I: System Flow Monitoring, Phase II: Sanitary Sewer Evaluations, and Phase III: Rehabilitation. The system flow monitoring plan and report presented the flows for all of the City's sewer basins. The results of Phases I and II identified seven basins that exceeded the County-mandated maximum allowable infiltration criterion of 5,000 gallons per day per inch diameter mile (gpd/idm).The purpose of this paper is to present the existing conditions of the City's sanitary sewer system; discuss the identification of potential sources of infiltration and inflow (I/I); and outline the prioritization strategy for immediate repairs, rehabilitation, replacement, inspection, and maintenance to reduce I/I.This paper presents an overview of the common causes of sewer system problems; how instances of these common problems were identified during the study; and how the technological tools used, combined with the data collected, have yielded the City an easy to apply, prioritized action plan for evaluating and rehabilitating their sanitary sewers to renovate severe structural defects and reduce the wet-weather flows beneath the 5,000 gpd/idm for all basins. The City is currently in the midst of the sewer rehabilitation construction contract and CDM will continue to assist with overseeing the rehabilitation and document the I/I reductions as the rehabilitation is completed in each basin.
机译:佛罗里达州迈阿密海滩市是迈阿密戴德水务和下水道部门(MDWASD)的大量下水道客户(VSC)。因此,纽约市必须遵守迈阿密-戴德县《下水道客户条例》(VSCO)96-166中规定的要求。为了满足VSCO的一项要求,纽约市完成了下水道评估调查(SSES)。 SSES项目包括多个阶段,包括第一阶段:系统流量监控,第二阶段:下水道评估和第三阶段:修复。系统流量监控计划和报告介绍了纽约市所有下水道的流量。第一和第二阶段的结果确定了七个盆地,超出了郡规定的最大允许渗透标准,即每英寸直径英里(gpd / idm)每天5,000加仑。 本文的目的是介绍纽约市下水道系统的现状;讨论确定潜在的渗透和流入来源(I / I);并概述了立即维修,修复,更换,检查和维护以减少I / I的优先级策略。 本文概述了下水道系统问题的常见原因。在研究过程中如何确定这些常见问题的实例;以及所使用的技术工具与所收集的数据相结合如何使纽约市易于评估,优先实施行动计划,以评估和修复其下水道,以修复严重的结构缺陷并减少5,000 gpd / idm以下的潮湿天气流量适用于所有盆地。纽约市目前正处于下水道修复建设合同之中,CDM将继续协助监督修复工作,并在每个流域修复工作完成后记录I / I减少量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号