Techno-economic analysis of large cross-section conductor for 110kV power grid reformation in Chongqing

机译:重庆110kV电网改革大型横截面导体的技术经济分析

获取原文

摘要

Electric network in Chongqing is too dense and power lines’ corridors are precious. For the limitation of the original lines’ sectional area, the capacity of the line can’t meet the need of electrical load’s development. The large cross-section conductor technology can be used to substantially increase the transmission capacity of overhead lines, and can solve the contradiction between the large demand for transmission capacity and the limited line corridors. This paper introduces simply the current project situation and technological development level of the big sectional wire electric transmission technology in China and analyzes the feasibility of large cross-section conductor on the basis of expanding the capacity of old 110kV power transmission line for 30% in Chongqing. The best procedure, which can bring us the largest social benefit and economical benefit, has been proposed through the all-around comparison of static investment and dynamic effect between the different procedures for expanding transmission capacity.
机译:重庆电网太密集,电力线路走廊珍贵。为了限制原始线路的区段区域,该线的容量不能满足电荷的发展的需求。大型横截面导体技术可用于大大提高架空线路的传动能力,并且可以解决对传输容量和限量线路走廊的大需求之间的矛盾。本文简单地介绍了中国大块电动传输技术的当前项目现状和技术开发水平,在重庆扩大旧的110kV电力传输线容量的基础上,分析了大横截面导体的可行性。通过全面比较静态投资和不同程序扩大传输能力之间的动态效应,提出了最佳社会效益和经济效益的最佳程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号