首页> 外文会议>OCEANS 2010 >Anchoring and mooring considerations for an OTEC pilot plant
【24h】

Anchoring and mooring considerations for an OTEC pilot plant

机译:OTEC中试工厂的锚泊和系泊注意事项

获取原文
获取外文期刊封面目录资料

摘要

Ocean Thermal Energy Conversion (OTEC) plants require placement at locations and water depths that provide the required thermal difference between warm surface waters and cold deep waters for efficient operation. The most favorable locations are frequently near tropical islands or atolls of volcanic origin. These locations generally have steep slopes, irregular bathymetry and uncertain sediment thicknesses. These sites present interesting challenges for anchoring and mooring such plants to meet wind/wave and extreme event criteria. The various bottom conditions at potential anchor locations may require different anchor solutions at each location. This paper describes possible anchor design solutions for an OTEC pilot plant planned for installation off Oahu, Hawaii to illustrate the design alternatives and choices.
机译:Ocean热能转换(OTEC)植物需要放置在地点和水深,在温热的表面水和冷深水之间提供所需的热差以进行高效操作。最有利的位置经常靠近热带岛屿或火山的环礁。这些位置通常具有陡峭的斜率,不规则的碱基滴定和不确定的沉积物厚度。这些网站存在有趣的挑战,用于锚定和停泊这些植物,以满足风/波和极端事件标准。潜在锚定位置处的各种底部条件可能在每个位置需要不同的锚固件。本文介绍了计划安装Oahu,夏威夷的OTEC试点工厂的可能锚设计解决方案,以说明设计替代品和选择。

著录项

  • 来源
    《OCEANS 2010》|2010年|P.1-8|共8页
  • 会议地点
  • 作者

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 海洋工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号