首页> 外文会议>IEEE Power and Energy Society General Meeting >Bridging the gap between operation and planning models in WECC
【24h】

Bridging the gap between operation and planning models in WECC

机译:弥合WECC的运营与规划模型之间的差距

获取原文

摘要

WECC groups and vendors work closely together toward development of new tools and procedures to ensure consistency between the two major models used in WECC, (West-wide System Model (WSM) used by Reliability Coordinators and planning basecases used to perform operational and planning studies), This work includes program features that enable traditional software to read a node-breaker power flow snapshot from WSM, perform different types of system studies, link this model to the WECC dynamic model database and perform dynamic simulations from real-time snapshots and for historical system events to validate the model. Results are compared to actual measurements obtained from phasor measurement units (PMUs). This paper shows some of the results.
机译:WECC集团和供应商密切合作开发新工具和程序,以确保WECC中使用的两个主要模型之间的一致性,(用于可靠性协调员和规划基础集团用于执行操作和计划研究的规划基础上使用的西方系统模型(WSM)之间的一致性此操作包括程序功能,使传统软件能够从WSM读取节点断路器电源流快照,执行不同类型的系统研究,将此模型链接到WECC动态模型数据库,并从实时快照和历史中执行动态模拟系统事件验证模型。将结果与从量量测量单元(PMU)获得的实际测量进行比较。本文显示了一些结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号