首页> 外文会议>IEEE Power and Energy Society General Meeting >Planning of conventional generation and renewable resources #x2014; 2012 IEEE PES general meeting
【24h】

Planning of conventional generation and renewable resources #x2014; 2012 IEEE PES general meeting

机译:规划常规生成和可再生资源 - 2012 IEEE PES股东大会

获取原文

摘要

New York's Renewable Portfolio Standard (RPS) is among the most ambitious in the country, with a renewable energy target of 30% by 2015. The amount of new renewable resources to be procured translates to roughly 10.4 million megawatt-hours (MWh) by 2015. Like most other regions, the majority of these renewable resources are located in remote areas of upstate and western New York, far from the downstate load centers. New York has over 1,300 megawatts (MW) of installed wind with another 4,600 MW of onshore wind at various stages of development and almost 2,000 MW of offshore wind in its interconnection queue [1].
机译:纽约的可再生产品组合标准(RPS)是该国最雄心勃勃的国家之一,可再生能源目标为2015年30%。到2015年,要采购的新可再生资源的数量转化为大约1040万兆瓦(MWH)到2015年。与大多数其他地区一样,这些可再生资源的大多数都位于北斯特泰特和纽约州的偏远地区,远离下行载荷中心。纽约拥有超过1,300兆瓦(MW)安装风,在各个发展阶段,近2,000兆瓦的互联队列中近2,000兆瓦的陆上风[1]。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号