首页> 外文会议>Reliability and Maintainability Symposium (RAMS), 2010 >Reintegration of sustainment into systems engineering during the department of defense acquisition process
【24h】

Reintegration of sustainment into systems engineering during the department of defense acquisition process

机译:在国防部采购过程中,将保障重新整合到系统工程中

获取原文

摘要

One of the major unintended consequences of Acquisition Reform efforts during the 1990s was a reduction in rigor of sustainment planning and effectiveness throughout materiel development programs. As the evidence of this problem mounted over the past decade, the Department of Defense (DoD) initiated efforts to rejuvenate sustainment planning during the early phases of program development. This article provides brief descriptions of the actions that have been taken, or that are being planned, to achieve this goal.
机译:1990年代购置改革工作的主要意外后果之一是在整个装备发展计划中降低了维持计划的严格性和有效性。在过去的十年中,越来越多的人证明了这一问题,国防部(DoD)在计划制定的早期阶段就开始着手振兴维持计划。本文提供了为实现此目标已采取或正在计划采取的行动的简要说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号