首页> 外文会议>2010 International Conference on Optoelectronics and Image Processing >Real-Time Georobot Automatic Monitoring During Shield Under-crossing Existing Tunnel
【24h】

Real-Time Georobot Automatic Monitoring During Shield Under-crossing Existing Tunnel

机译:盾构穿越现有隧道时的实时Georobot自动监测

获取原文

摘要

During under-crossing shield, the monitoring of the existing tunnel has been done by the improved Georobot automatic deformation monitoring system. Results show the iron rails of existing tunnel have some regular settlement, difference settlement and lateral deformation. The vertical and lateral compressive and tensile deformation also exist in the structure of the tunnel section. The automatic deformation monitoring system based on Georobot owns a series of advantages such as comprehensive deformation information acquisition, high-precision, easy-installation, reusable.
机译:在越界盾构期间,现有隧道的监控已通过改进的Georobot自动变形监控系统完成。结果表明,既有隧道的铁轨有一定规律的沉降,差异沉降和侧向变形。隧道截面的结构中也存在竖向和横向的压缩变形和拉伸变形。基于Georobot的变形自动监测系统具有全面的变形信息采集,高精度,易于安装,可重复使用等优点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号