首页> 外文会议>International Conference on Optoelectronics and Image Processing >Real-Time Georobot Automatic Monitoring During Shield Under-crossing Existing Tunnel
【24h】

Real-Time Georobot Automatic Monitoring During Shield Under-crossing Existing Tunnel

机译:盾牌欠桥现有隧道中的实时石像托管自动监测

获取原文

摘要

During under-crossing shield, the monitoring of the existing tunnel has been done by the improved Georobot automatic deformation monitoring system. Results show the iron rails of existing tunnel have some regular settlement, difference settlement and lateral deformation. The vertical and lateral compressive and tensile deformation also exist in the structure of the tunnel section. The automatic deformation monitoring system based on Georobot owns a series of advantages such as comprehensive deformation information acquisition, high-precision, easy-installation, reusable.
机译:在穿过过桥盾期间,通过改进的Georobot自动变形监测系统进行了对现有隧道的监控。结果显示现有隧道的铁轨具有一些正沉降,差异沉降和横向变形。垂直和横向压缩和拉伸变形也存在于隧道部分的结构中。基于Georobot的自动变形监测系统拥有一系列优势,如全面变形信息采集,高精度,易于安装,可重复使用。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号