首页> 外文会议>2010 International Conference on Computer Application and System Modeling >Job-shop scheduling considering dispatching rules of machines and material handling devices based on simulation
【24h】

Job-shop scheduling considering dispatching rules of machines and material handling devices based on simulation

机译:考虑仿真的机器和物料搬运设备调度规则的车间调度

获取原文

摘要

In order to utilize production resources efficiently and reduce the number of work-in-process(WIP), material handling device (MHD) is often used to coordinate with manufacturing operations in job-shops. The relationship between machine's scheduling and MHD's dispatching is studied in this paper. The simulation method is applied with simple heuristic dispatching rules for machines, MHD is used to generate active and feasible schedule. The mean flow time and mean tardiness of jobs are selected as the performance measures. The simulation shows that MHD dispatching rules have significant influence on system performance.
机译:为了有效地利用生产资源并减少工程过程(WIP)的数量,材料处理设备(MHD)通常用于与工作商店中的制造操作协调。本文研究了机器调度与MHD调度之间的关系。使用简单的机器调度规则应用仿真方法,MHD用于生成主动和可行的时间表。选择工作的平均流量和均值迟到作为性能措施。模拟表明,MHD调度规则对系统性能有重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号