首页> 外文会议>International conference on ocean, offshore and arctic engineering;OMAE2009 >ECONOMICAL FEASIBILITY STUDY OF ABANDONED OILFIELDS UTILIZING SMART MODELING APPROACH: CASE STUDY
【24h】

ECONOMICAL FEASIBILITY STUDY OF ABANDONED OILFIELDS UTILIZING SMART MODELING APPROACH: CASE STUDY

机译:利用智能建模方法对废弃油田进行经济可行性研究:案例研究

获取原文
获取外文期刊封面目录资料

摘要

Petrel, Eclipse and Monte Carlo are three simulators often used separately to evaluate reservoir structure, production performance and economics/planning/risk analysis respectively. Integration of the three packages provides a very comprehensive and efficient assessment tool for oilfields or blocks with limited data by avoiding incompatibility, data transformation and interface problems.Many oil and gas fields that have been discovered in the past and abandoned as a high risk venture have become of prime interest to numerous smart investors taking advantage of high oil prices and advanced technology. Some of these discoveries have exhibited reasonable hydrocarbon accumulations through seismic surveys, actual drilling and initial well-testing. Their development has previously been hindered by uncertainty and by low oil prices. The ALT Field, North Africa, is a typical example. Only nine vertical wells were drilled in the ALT Field during the 1960's including three dry holes. Low production from three zones of Chalk Carbonate formation with moderate porosity and very low permeability (less than 1 md), meant the field has been abandoned for over three decades. Recently, with oil prices flourishing, the field has caught the eye of many potential developers.By utilizing the three-simulator approach, the ALT field has been verified as a potential producer of commercial oil. Two scenarios, single-pool and two-pool, have been established for describing the field structure, both are economically feasible,with more profitability foreseen from the single-pool scenario. The two-pool scenario demonstrated the field contains 885MMblls OIIP with estimated total reserves of 310MMbbls of oil using waterflooding alone and an additional 89MMbbls using CO2 injection. The existing six vertical producers are recommended to be used for injection, while a pattern of horizontal wells are suggested to be drilled and used as producers. The horizontal wells are favored over vertical ones to overcome the very low permeability situation.Development of the ALT Field is ongoing based upon the findings of this study. The idea of the three-simulator approach has proven workable, thus has potential to be used in similar cases once minor technical software problems are resolved.
机译:Petrel,Eclipse和Monte Carlo是通常分别用于评估储层结构,生产性能和经济/计划/风险分析的三个模拟器。通过避免不兼容,数据转换和接口问题,这三个软件包的集成为数据有限的油田或区块提供了非常全面和有效的评估工具。 过去已发现的许多油气田,已被放弃作为高风险的企业,已经成为许多利用高油价和先进技术的精明投资者的主要兴趣所在。其中一些发现通过地震勘测,实际钻探和初步试井显示出合理的油气藏。以前,不确定性和低油价阻碍了它们的发展。北非的ALT场就是一个典型的例子。 1960年代在ALT油田仅钻了9口垂直井,其中包括3个干孔。三个中等孔隙率和极低渗透率(小于1 md)的碳酸盐碳酸盐岩地层的产量低,这意味着该油田已经废弃了三十多年。最近,随着油价的上涨,该领域引起了许多潜在开发商的注意。 通过使用三模拟器方法,ALT领域已被证明是潜在的商业石油生产商。已经建立了用于描述场结构的两种方案,即单池和两池,这两种方案在经济上都是可行的, 从单池方案中可以预见到更多的获利能力。两池方案表明,该油田包含885MMblls的OIIP,仅使用注水法估算的总储量为310MMbbls的油,而使用CO2注入的储量总计为89MMbbls。建议使用现有的六个垂直生产井进行注入,而建议钻一个水平井的井并将其用作生产井。水平井优于垂直井,以克服渗透率极低的情况。 根据这项研究的结果,ALT领域的开发正在进行中。三模拟器方法的想法已被证明是可行的,因此一旦解决了较小的技术软件问题,便有可能在类似情况下使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号