首页> 外文会议>Zhengzhou conference on management of technology;MOT 2009 >The Application of Improved Earned Value Management Method in Engineering Project Management
【24h】

The Application of Improved Earned Value Management Method in Engineering Project Management

机译:改进的挣值管理方法在工程项目管理中的应用

获取原文

摘要

The Earned Value Management (EVM) is an effective project management method that originated in the 60’s of 20th century in the United States for national defense projects. It compares the planned value,the actual value with the earned value at a certain point of time to deter mine if the cost and schedule of project is in control. But Earned Value Management method still has some defi ciencies. This article manages to compensate for these deficiencies of EVM with introducing quality variables and other approaches,and analyzes the effectiveness of the improved EVM application finally.
机译:挣值管理(EVM)是一种有效的项目管理方法,起源于20世纪60年代的美国国防项目。它将计划值,实际值与某个时间点的挣值进行比较,以确定项目的成本和进度是否受控制。但是,挣值管理方法仍然存在一些缺陷。本文通过引入质量变量和其他方法来设法弥补EVM的这些不足,并最终分析了改进的EVM应用程序的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号