【24h】

Foundation Replacement With No Disturbance

机译:地基更换无干扰

获取原文

摘要

A three story hotel in Irving, Texas, home to some of the worst soil conditions in the nation, was underpinned with piers that were belled in the active zone. As a result of errors by the engineer and/or contractor, the piers uplifted and moved the building to extreme deflections that exceeded 8". To mitigate the problem, 360 - 18" diameter x 35' deep drilled piers were installed under the building in five foot of headroom. Despite the low headroom, the new piers were drilled into gray shale a minimum penetration of 10'. This process was completed while keeping the hotel in full operation with no interruption in services and minimal effects to the landscaping and appearance.
机译:得克萨斯州欧文(Irving)的一间三层楼高的旅馆曾是全美一些土壤条件最恶劣的地方,但在活动区悬挂着码头。由于工程师和/或承包商的错误,桥墩抬起并将建筑物移至超过8“的极限挠度。为缓解该问题,在建筑物的下方安装了360-18”直径x 35'深钻孔的桥墩。五英尺的净空。尽管净空高度很低,但新的码头已钻入灰色页岩中,最小穿透深度为10'。该过程已完成,同时保持了酒店的全面运营,服务没有中断,并且对美化和外观的影响最小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号