首页> 外文会议>Offshore technology conference 2009 (OTC 09) >Full Field Development With Open Hole Concept at SUDP-A
【24h】

Full Field Development With Open Hole Concept at SUDP-A

机译:在SUDP-A上采用裸眼概念进行全场开发

获取原文

摘要

Sumandak Area Integrated Field Development Project comprises of 2 phases, which includes Sumandak Main, Sumandak Tengah, Sumandak Selatan, Sumandak Tepi and Sumandak Ujong. Sumandak Main field development is considered as Phase 1 of the total Sumandak Area development. Figure A-1 shows the location of Sumandak Field Development area within Samarang - Asam Paya blocks in Sarawak region, east of Malaysia. A 28 slots four-legged platform, Sumandak-A (SUDP-A) platform was successfully installed at location on October 2006. SUDP-A field development project has opted for open hole completion for all of the 21 wells. This completion system was deployed to 14 oil producers (OP), 2 water injectors (WI) , 1 gas well and 4 combination wells of OP and WI. With the advancement of technology, the drilling team decided to use open hole completion with wire wrapped screen (WWS) for sand control and swell packer for zonal isolation. With this type of sand control and completion, operation such as running and cementing production casing, scraper run and perforation can be eliminated. In addition, significant rig time savings due to simple rig operations and direct tool cost savings make this technology viable and attractive. Open hole completion has its own risks and challenges that require detail consideration beforehand and with sheer determination, the project team has managed to calculate the risks and came up with proper solution and recommendation. Full field development with open hole concept in Sumandak Main development Project is considered another milestone achievement by Petronas Carigali Sdn Bhd (PCSB). This paper precisely discusses all the strategies and steps taken to ensure that this concept can be successfully carried out by the project team, and also lessons leamt throughout the operation at SUDP-A platform.
机译:苏曼达克地区综合野外开发项目包括两个阶段,包括苏曼达克主要地区,苏曼达克登加,苏曼达克塞拉坦,苏曼达克特皮和苏曼达克乌戎。 Sumandak主要油田开发被视为Sumandak地区总开发的第一阶段。图A-1显示了马来西亚东部砂拉越地区Samarang-Asam Paya区块内Sumandak油田开发区的位置。已于2006年10月在现场成功安装了28个插槽的四足平台Sumandak-A(SUDP-A)平台。SUDP-A现场开发项目已选择对所有21口井进行裸眼完井。该完井系统已部署到14个采油厂(OP),2个注水井(WI),1个气井以及4个OP和WI组合井。随着技术的进步,钻探团队决定使用带有钢丝包裹筛网(WWS)的裸眼完井来进行防砂,并使用膨胀封隔器进行地层隔离。通过这种类型的防砂和完井,可以消除诸如运行和固井生产套管,刮板运行和射孔之类的操作。此外,由于简单的钻机操作和直接的工具成本节省,大大节省了钻机时间,使该技术可行且具有吸引力。裸眼完井有其自身的风险和挑战,需要事先进行详细考虑,并且通过绝对的决心,项目团队设法计算了风险,并提出了适当的解决方案和建议。 Sumandak主要开发项目中具有裸眼概念的全田开发被Petronas Carigali Sdn Bhd(PCSB)视为又一个里程碑式的成就。本文精确地讨论了确保项目团队可以成功实施此概念的所有策略和步骤,并在SUDP-A平台的整个操作过程中吸取了教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号