首页> 外文会议>CRIOCM international symposium on advancement of construction management and real estate >Study on the Program Breakdown Structure System of the South-to-North Water Diversion Project
【24h】

Study on the Program Breakdown Structure System of the South-to-North Water Diversion Project

机译:南水北调工程项目分解结构系统研究

获取原文

摘要

The South-to-North Water Diversion Project is a large-scale engineering project which includes three parts named as Eastern Route Project (ERP), Middle Route Project (MRP) and Western Route Project (WRP). The South-to-North Water Diversion Project is a large-scale engineering project which includes many kinds of projects and participants, at the same time, several management models are applied in the Southto-North Water Diversion Project Given the complexity of the project, the traditional WBS (Work Breakdown Structure) or PBS (Project Breakdown Structure) is not suitable for the decision-making group and the managing departments of the South-to-North Water Diversion Project Based on the Program Management, the concept of Program Breakdown Structure (PgBS) is proposed in this paper, and the PgBS system of the South-to-North Water Diversion Project is conceived, which will be the important basis of the Program Management of the South-to-North Water Diversion Project.
机译:南水北调工程是一个大型工程项目,包括三个部分,分别称为东线工程(ERP),中线工程(MRP)和西线工程(WRP)。南水北调工程是一个大型工程项目,包括许多项目和参与者,同时,由于工程的复杂性,南水北调工程采用了多种管理模式,传统的WBS(工作分解结构)或PBS(项目分解结构)不适合基于程序管理,程序分解结构概念的南水北调工程的决策小组和管理部门本文提出了PgBS系统,构想了南水北调工程的PgBS系统,这将成为南水北调工程计划管理的重要基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号