Risk informed Management for the Outage Optimization Using PSA

机译:使用PSA进行停电优化的风险告知管理

获取原文

摘要

1IntroductionConventionally,since before being used the PSA evaluation,the shutdown safety management with the deterministic approach inside the technical specifications has been enforced mitigate its consequences in order to prevent the trouble or mitigate its consequences. In addition,the importance of safety control during plant shutdown has attracted much attention,spurred by many event reports including house those from Diablo Canyon and Vogtle nuclear power plants in the US. Though risk present in midloop operation is unique to PWR plants,fortunately no significant event has occurred at PWRs in Japan so far.Even with such operating result as this,taking into account recent distrust of the public on nuclear safety in Japan,any trouble occurred during plant shutdown should impair public confidence toward nuclear power generation,as well as lead to more restricted regulations. Therefore,it is critical to prevent occurrence of any safety-related events during shutdown period.
机译:1简介出于惯例,自从使用PSA评估以来,已经在技术规范内采用确定性方法实施了停机安全管理,以减轻其后果,以防止出现问题或减轻其后果。此外,在许多事件报告的推动下,包括在美国的暗黑破坏神峡谷和Vogtle核电站的事件报告中,工厂停工期间安全控制的重要性引起了广泛关注。尽管中压运行中存在的风险是压水堆电厂特有的,但幸运的是,迄今为止,日本的压水堆没有发生任何重大事件。即使这样的运行结果,考虑到日本公众最近对核安全的不信任,也发生了任何麻烦。在工厂停产期间,应削弱公众对核电的信心,并导致更加严格的法规。因此,至关重要的是防止在停机期间发生任何与安全相关的事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号