首页> 外文期刊>Journal of nuclear science and technology >Using Risk-Informed Asset Management for Feedwater System Preventative Maintenance Optimization
【24h】

Using Risk-Informed Asset Management for Feedwater System Preventative Maintenance Optimization

机译:使用风险信息资产管理进行给水系统预防性维护优化

获取原文
获取原文并翻译 | 示例
           

摘要

The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization using plant-specific data are also presented.
机译:介绍了南德克萨斯项目核运营公司流程的初步开发,该流程通过应用“工厂平衡”模型和“风险信息化资产管理” alpha级软件应用程序来支持预防性维护优化。在工厂维护或改进高水平核安全性的同时,使用南德克萨斯州项目风险信息资产管理软件评估预防性维护活动。在“植物平衡”可用性应用程序中,通过在超级组件级别上详细说明当前模型,增强了给水系统的详细程度,以支持在组件故障模式和人为错误模式下的工厂决策。契约。提出了增强的模型和建模技术。还介绍了使用工厂特定数据进行给水系统预防性维护优化的案例研究结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号