Recently, many distributed generation systems have been installed in power distribution networks. In the case of an extensive penetration of distributed generation systems, serious problems such as overvoltage at the customer receiving end as a result of surplus photovoltaic generation and islanding phenomena at a fault in a distribution line may occur. In particular, the distribution line may become overloaded during fault recovery because all distributed generation systems must stop operating instantly to prevent islanding at the fau then, generation cannot be resumed instantly in accordance with the grid interconnection code in Japan. However, distribution network operators can prevent overload if the operation status of distributed generators can be estimated in advance. As a first step of inferring the operation status of distributed generators, we developed two methods of inferring the operation status of distributed generators at the customer receiving end. One was a method for low-voltage customers, in which the change in power factor measured at the customer receiving end was used. The other was a method for medium-voltage customers, in which both the active power and power factor measured at the customer receiving end were used. These two methods could infer that the distributed generators are “in operation” or “not in operation” at the customer receiving ends. However, the operation status in a distribution section, which is sectioned by two pole-mounted gas switches, should be inferred from the viewpoint of distribution operation. As the active power and power factor in the distribution section are affected by the loads of other customers, it is
机译:最近,许多分布式发电系统已经安装在配电网络中。在分布式发电系统的广泛普及的情况下,可能会出现严重问题,例如由于光伏发电量过剩而导致客户接收端出现过压,以及配电线路故障时出现孤岛现象。特别是,在故障恢复期间,配电线路可能会过载,因为所有分布式发电系统必须立即停止运行以防止出现故障。则不能按照日本的电网互连代码立即恢复发电。但是,如果可以预先估计分布式发电机的运行状态,则配电网络运营商可以防止过载。作为推断分布式发电机运行状态的第一步,我们开发了两种在客户接收端推断分布式发电机运行状态的方法。一种是针对低压客户的方法,其中使用了在客户接收端测量的功率因数变化。另一种是针对中压客户的方法,其中使用了在客户接收端测量的有功功率和功率因数。这两种方法可以推断出分布式发电机在客户接收端处于“运行中”或“不处于运行中”。但是,应该从配电操作的角度推断配电部分的运行状态,该配电部分由两个安装在极上的气体开关分隔。由于配电部分的有功功率和功率因数受其他客户负载的影响,因此

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号