首页> 外文会议>2009 rapid excavation and tunneling conference proceedings >SAO PAULO METRO PROJECT-CONTROL OF SETTLEMENTS IN VARIABLE SOIL CONDITIONS THROUGH EPB PRESSURE AND BICOMPONENT BACKFILL GROUT
【24h】

SAO PAULO METRO PROJECT-CONTROL OF SETTLEMENTS IN VARIABLE SOIL CONDITIONS THROUGH EPB PRESSURE AND BICOMPONENT BACKFILL GROUT

机译:圣保罗地铁项目通过EPB压力和双组分反灌灌浆控制各种土壤条件下的沉降

获取原文

摘要

The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and a well organized monitoring system, to control surface settlements and ground distortion, are items of utmost importance in EPB tunnelling process.The paper describes how these concepts have been applied while excavating in the difficult underground conditions found at Sao Paulo (Brazil) during the execution of the Sao Paulo Metro Line 4-Lot 1.In this project, the annular gap has been filled by two components type, cement grouting. The back feed of the extensive monitoring campaign carried out to check the surface settlements during the excavation and hyperbaric maintenance operations will also be described in the paper.
机译:在TBM推进和高压活动过程中,EPB参考压力,完全有效地填充隧道衬砌拱顶与开挖段之间的环形缝隙以及组织良好的监控系统以控制地面沉降和地面变形是至关重要的在EPB隧道过程中。 本文描述了在圣保罗地铁4号地段1号线执行过程中在巴西圣保罗发现的困难地下条件下进行挖掘时如何应用这些概念。 在该项目中,环形间隙已由水泥灌浆这两个组件类型填充。本文还将介绍在开挖和高压维护操作期间进行的广泛监测活动的后向检查,以检查地面沉降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号