首页> 外文会议>Rapid excavation and tunneling conference >SAO PAULO METRO PROJECT-CONTROL OF SETTLEMENTS IN VARIABLE SOIL CONDITIONS THROUGH EPB PRESSURE AND BICOMPONENT BACKFILL GROUT
【24h】

SAO PAULO METRO PROJECT-CONTROL OF SETTLEMENTS IN VARIABLE SOIL CONDITIONS THROUGH EPB PRESSURE AND BICOMPONENT BACKFILL GROUT

机译:Sao Paulo Metro项目 - 通过EPB压力和双组分回填灌浆控制可变土壤条件下的定居点

获取原文

摘要

The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and a well organized monitoring system, to control surface settlements and ground distortion, are items of utmost importance in EPB tunnelling process. The paper describes how these concepts have been applied while excavating in the difficult underground conditions found at Sao Paulo (Brazil) during the execution of the Sao Paulo Metro Line 4-Lot 1. In this project, the annular gap has been filled by two components type, cement grouting. The back feed of the extensive monitoring campaign carried out to check the surface settlements during the excavation and hyperbaric maintenance operations will also be described in the paper.
机译:在TBM推进和高压活动期间EPB参考压力的尊重,完全有效地填充了隧道衬里弧子和挖掘部分之间的环形间隙,以及控制表面沉降和地面失真,是最重要的项目在EPB隧道过程中。本文介绍了如何在Sao Paulo(巴西)在执行Sao Paulo Metro Lime 4-Lot 1.在这个项目中的艰难地下条件下挖掘出来的概念,同时在Sao Paulo Metro Line 4-Lot 1.在这个项目中,环形差距已被两个组件填充类型,水泥灌浆。在挖掘和高压维护操作期间,对检查表面沉降和高压维护操作的广泛监测活动的后源也将在纸上描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号