BRIGHTWATER CONVEYANCE SYSTEM: GROUND FREEZING FOR ACCESS SHAFT EXCAVATION THROUGH SOFT GROUND

机译:BRIGHTWATER输送系统:通过软土地基进出地面的冻结

获取原文

摘要

The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavation of the Ballinger Way Receiving Portal to 65.8 m (216 ft) below grade through challenging geology was accomplished by means of artificial ground freezing. This paper discusses freeze design development, system installation and monitoring, and the contractual and construction challenges that were overcome, including work sequencing and excavation means and methods, together with lessons learned.
机译:位于华盛顿州金县的Brightwater地区废水处理设施正在建设中,包括一个广泛的输送系统,该系统将具有较深的,软土地基的隧道和竖井。通过人工地质冻结,通过具有挑战性的地质,将Ballinger Way接收门户开挖至海拔65.8 m(216 ft)以下。本文讨论了冻结设计的开发,系统安装和监视以及克服的合同和施工挑战,包括工作顺序和开挖方法和方法,以及所汲取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号