【24h】

Assembly Line Balance and Assembly Process Simulation with Multi-Station and Stopping Line Operation

机译:多工位和停机线操作的流水线平衡和流水线过程仿真

获取原文

摘要

In order to avoid undesirable idling or fuss of the manufacturing resources,the assembly workshop’s scheduler evaluates the effect of different online sequence of parts on production cycle,balances workload and utilization ratio,minimizes span of the assembly line.This paper studies assembly line modeling and simulation with multi-station and stopping line operation,builds mathematical model for the assembly line both under certainty and uncertainty environment.Assembly line problem with these two conditions is simulated,and a simulation prototype system is developed.Simulation application with one Auto Company in Beijing using real time data of assembly workshop validates the effectiveness and correctness of the prototype system.
机译:为了避免不必要的闲置或制造资源的混乱,装配车间的调度程序会评估不同在线零件序列对生产周期,平衡工作量和利用率,最小化装配线的影响。多工位和停车线运行仿真,在确定性和不确定性环境下建立流水线数学模型。对这两个条件下的流水线问题进行仿真,并开发了仿真原型系统。某汽车公司在北京的仿真应用利用装配车间的实时数据验证了原型系统的有效性和正确性。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号