WATERLINE PROTECTION IN A DOWNTOWN ELECTRIC RAIL CORRIDOR

机译:市区电气化走廊的水线保护

获取原文

摘要

The design criteria for an electric rail line servicing the center of downtown Portland, Oregon required "boot" type rail insulation and a 10-ft separation between the track slab and paralleling waterlines. Crossing waterlines were isolated with casings or sleeves for a 10-ft distance from the track slab. Where there was not adequate clearance for the specified separation between the track slab and neighboring waterlines, there were compromises to Portland Water Bureau's design standard and the track slab was additionally insulated with a secondary liner. This paper describes the design, construction, and field-testing of the track and waterlines.
机译:用于俄勒冈州波特兰市中心的电动铁路线的设计标准要求采用“引导”式铁路绝缘,并在轨道板和平行水线之间留出10英尺的间隔。交叉的水线用套管或套筒隔离,距轨道平板10英尺。如果在轨道板和相邻的水线之间没有足够的间隙来指定间距,则对波特兰水务局的设计标准有所妥协,并且使用辅助衬里对轨道板进行额外的绝缘。本文介绍了轨道和水线的设计,施工和现场测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号