首页> 外文会议>Offshore Technology Conference(OTC 08): Waves of Change >Methodology to Establish the Fitness for Continued Service of a Damaged Export Pipeline in 1000 m of Water
【24h】

Methodology to Establish the Fitness for Continued Service of a Damaged Export Pipeline in 1000 m of Water

机译:建立在1000 m水中继续损坏的出口管道的适应性的方法

获取原文

摘要

Deepwater pipelines are critical arteries that transport gas and oil production from the Gulf of Mexico to onshore transportation hubs. The yearly hurricane season in the GoM has a serious impact on the reliability of this infrastructure, as evidenced by the severe damage experienced, and subsequent difficulty and delay returning to full service. The difficulty arises from the various challenges in damage, inspection and evaluation as well as the delay in analysis and procuring the repair hardware needed. Many of the damaged pipelines need extensive and time-consuming repairs depending on the severity and criticality. However, if sufficiently conservative and prudent analytical methodologies are used, many of the damaged lines can be inspected, analyzed and established to be fit for continued finite service. Employing a combination of repair and fitness for service analysis can effectively manage the risk of damaged deepwater lines, while in some cases, continuing operation. In this paper, an approach is presented that can be used to analyze and establish the integrity of damaged lines. It reviews the various analysis methods available and integrates one or more of the methods to arrive at a unified approach. The approach is illustrated through an example of a 20" dented pipeline in 1000 m of water, where the fatigue life was estimated using FEA, simple dent fatigue equations and further validated using full scale testing. A decision tree that provides guidelines for deepwater pipeline damage evaluation and fitness for service is provided.
机译:深水管道是将墨西哥湾运输到陆上交通枢纽的临界动脉。 GOM的年飓风季节对这一基础设施的可靠性产生了严重影响,正如经验丰富的严重损害所证明,随后的困难和延迟返回全方位服务。难以造成损害,检验和评估的各种挑战以及需要延迟和采购维修硬件的延迟。根据严重程度和临界,许多损坏的管道需要广泛且耗时的维修。然而,如果使用足够保守和谨慎的分析方法,则可以检查许多损坏的线,以适合继续有限服务。采用维修和适应性的组合可以有效地管理受损深水线路的风险,而在某些情况下,继续运行。本文提出了一种方法,可用于分析和建立损坏线的完整性。它审查各种分析方法可用,并集成了一个或多个方法来实现统一的方法。该方法通过1​​000米的水中的20“凹陷管道的示例来示出,其中使用FEA,简单的凹陷疲劳方程估计疲劳寿命并使用全尺度测试进一步验证。一个决策树,为深水管道损坏提供指导提供服务评估和健身。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号