Premature Yielding Identified in First Comprehensive 2-million-lbm Deepwater Landing String Test Program

机译:在首个全面的200万磅深水着陆柱测试计划中确定了过早屈服

获取原文

摘要

The purpose of this paper is to present the results of a comprehensive test program conducted with five different sets of deep-water landing string handling equipment consisting of both conventional and unconventional technology. A thorough presentation will be made detailing initial testing at elastic loads approaching yield and final high load testing beyond yield. All stages of the test program will be discussed including original testing protocol, test setup, testing performed, test results, and overall conclusions. This is one of the first standardized test programs used across five different designs of handling equipment. This overall presentation of the test program is made to identify stress levels associated with the extreme loads that occur when landing very heavy casing strings in deep-water wells.
机译:本文的目的是介绍一项综合测试程序的结果,该程序使用五套不同的深水着陆柱处理设备进行了测试,这些设备均包括常规技术和非常规技术。将进行详尽的介绍,详细说明在接近屈服的弹性载荷下的初始测试以及在屈服之后的最终高载荷测试。将讨论测试程序的所有阶段,包括原始测试协议,测试设置,执行的测试,测试结果以及总体结论。这是在五个不同设计的搬运设备中使用的首批标准化测试程序之一。测试程序的总体介绍旨在确定与非常重的套管柱在深水井中着陆时发生的极端载荷相关的应力水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号