首页> 外文会议>International Association of Drilling Contractors and Society of Petroleum Engineers Drilling Conference and Exhibition >Premature Yielding Identified in First Comprehensive 2-million-lbm Deepwater Landing String Test Program
【24h】

Premature Yielding Identified in First Comprehensive 2-million-lbm Deepwater Landing String Test Program

机译:在第一份全面的2000万LBM深水登陆串测试程序中确定了早产屈服

获取原文

摘要

The purpose of this paper is to present the results of a comprehensive test program conducted with five different sets of deep-water landing string handling equipment consisting of both conventional and unconventional technology. A thorough presentation will be made detailing initial testing at elastic loads approaching yield and final high load testing beyond yield. All stages of the test program will be discussed including original testing protocol, test setup, testing performed, test results, and overall conclusions. This is one of the first standardized test programs used across five different designs of handling equipment. This overall presentation of the test program is made to identify stress levels associated with the extreme loads that occur when landing very heavy casing strings in deep-water wells.
机译:本文的目的是介绍一系列综合测试计划的结果,其中五种不同的深水着陆串处理设备,包括传统和非传统技术。将在彻底的展示中详细介绍,以弹性负载接近产量和最终高负荷测试而不是收益率。将讨论测试程序的所有阶段,包括原始测试协议,测试设置,进行测试,测试结果和总体结论。这是跨五种不同设计的处理设备的第一个标准化测试程序之一。测试程序的整体呈现,以识别与在深水井中降落非常重的套管串时发生的极端载荷相关的应力水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号