首页> 外文会议>Canadian Society for Civil Engineering annual conference >INCORPORATION OF ROUNDABOUTS AT HOLT RD INTERCHANGE
【24h】

INCORPORATION OF ROUNDABOUTS AT HOLT RD INTERCHANGE

机译:在Holt Rd Interchange加入环形交叉路口

获取原文

摘要

The planned refurbishment of the Darlington Nuclear Generating Station (DNGS) by the Ontario Power Generation (OPG), scheduled to commence in late-2016 and extend until 2026, will result in significant employment growth and increased traffic volumes that cannot be supported by the area's roadway network. In particular, the original Highway 401/Holt Road interchange, located approximately 40 km east of Toronto and serving as the primary access route for employee traffic into and out of the DNGS, was in need of significant upgrade and improvement in advance of commencing the refurbishment. The original interchange provided partial access to the highway only, while an intersection between an adjacent service road and the eastbound off-ramp was considered both unconventional and potentially hazardous to drivers unfamiliar with the unique configuration. Further, the original Holt Road underpass structure precluded the necessary capacity additions required along both the crossing road and Highway 401 through the interchange. Consequently, the Ontario Ministry of Transportation (MTO) hired AECOM to provide Preliminary and Detail Design services for upgrading of the Highway 401/Holt Road interchange to address both the existing concerns and meet the future requirements of the area. The recommended design included provision of roundabouts at both the north and south ramp terminals, and a third successive multi-lane roundabout at a service road directly south of the interchange. The provision of roundabouts at freeway ramp terminals, in place of traffic signals, represents the first time such a design has been used on an MTO facility.
机译:安大略省发电(OPG)计划翻新达林顿核发电站(DNG),计划于2016年底开始,并延长到2026年,将导致该地区无法支持的大量就业增长和增加的交通量巷道网络。特别是,原始高速公路401 / Holt路交换,位于多伦多以东大约40公里处,作为员工流量进出DNG的主要访问路线,需要在开始翻新之前进行重大升级和改进。原始交汇处仅提供了对高速公路的部分访问,而相邻的服务道路与东行非坡道之间的交叉点被认为是非常规的,并且可能危害司机不熟悉的授权。此外,原始HOLT路面结构绝不能通过交换来沿着穿越道路和高速公路401所需的必要容量添加。因此,安大略省交通部(MTO)聘请了AECOM,为升级401 / Holt路交汇处提供初步和详细的设计服务,以解决现有问题,满足该地区的未来要求。推荐的设计包括在北部和南坡终端的环形交叉路口,以及在交汇处南部的服务道路上的第三个连续的多车道环形交叉路口。在高速公路斜坡终端提供环形交叉路口,代替交通信号,代表这种设计首次在MTO设施上使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号