首页> 外文会议>China International Conference on Electricity Distribution >Study on evaluation system and power supply scheme for large-scale and extra-high power electric arc furnace connected to the grid
【24h】

Study on evaluation system and power supply scheme for large-scale and extra-high power electric arc furnace connected to the grid

机译:大规模超高功率电弧炉评估系统和电源方案的研究进入栅格

获取原文

摘要

This paper analyzes adverse effect of electric arc furnace impact load on grid power quality and generator operation etc., starting from operating characteristics of electric arc furnace, and proposes evaluation system, evaluation program, and treatment measures for connection of EAF to grid. Through study of factors affecting power supply scheme for large scale extra-high power electric arc furnace, it is known that the key of power supply scheme selection is voltage fluctuation and flicker caused by connection of EAF to grid and the effect on generator shafting. Using the distributed power supply scheme for the 6 extra-high power EAF in Zhangjiagang region as an instance, an improved scheme of power supply to large scale extra-high power EAF is proposed, i.e. construction of 500 kV Jinfeng Substation that will be exclusively used for EAF loads. Results of simulation show that this scheme can greatly improve public supply network power quality and reduce effect on generator shafting.
机译:本文分析了电弧炉冲击载荷对电网电力质量和发电机操作等的不利影响,从电弧炉的运行特性开始,提出了评估系统,评估计划和用于连接到网格的处理措施。通过研究影响大型超高功率电弧炉电源方案的因素,众所周知,电源方案选择的关键是由EAF连接到电网的电压波动和闪烁,以及对发电机轴系的影响。利用张家港地区6超高功率EAF的分布式电源方案作为一个实例,提出了一种改进的电源方案,对大规模超高功率EAF进行了改进的电源方案,即建造500 kV金丰变电站,该变电站将被专门使用对于eAF负载。仿真结果表明,该方案可以大大提高公共供应网络电能质量,减少对发电机轴系的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号