首页> 外文会议>International Symposium on Multiphase Flow, Heat Mass Transfer and Energy Conversion >Study of Thermal Calculation for 350MW Boiler to Burn Mixture of Pulverized Coal and Blast Furnace Gas
【24h】

Study of Thermal Calculation for 350MW Boiler to Burn Mixture of Pulverized Coal and Blast Furnace Gas

机译:350MW锅炉燃烧煤粉与高炉煤气混合气的热力计算研究。

获取原文

摘要

It is usually happened that the steam temperature different from the design value in many power plants' boilers. To resolve the problem that the main steam temperature and reheat steam temperature being low at 3# boiler oi Baosteel power plant, which burned mixture of pulverized coal and blast furnace gas, a thermal calculation program is designed and calculated for the boiler. Through changing the operating condition respectively, the results of thermal calculation are obtained. The factors affecting main steam temperature, reheat steam temperature and the gas temperature are discussed. Some conclusions are provided for improving the steam temperature property, resolving the problem of steam temperature being low and optimizing the operation of the boiler.
机译:在许多发电厂的锅炉中,通常会发生蒸汽温度与设计值不同的情况。为解决宝钢电厂3#锅炉粉煤与高炉煤气混合气燃烧主蒸汽温度和再热蒸汽温度低的问题,设计并计算了锅炉的热力计算程序。通过分别改变工作条件,可获得热计算结果。讨论了影响主蒸汽温度,再热蒸汽温度和气体温度的因素。为改善蒸汽温度特性,解决蒸汽温度低的问题,优化锅炉的运行提供了一些结论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号