首页> 外文会议>Offshore technology conference >Campos Basin Tertiary Reservoirs of Barracuda and Caratinga Fields: Development Strategy and Main Reservoir Management Issues
【24h】

Campos Basin Tertiary Reservoirs of Barracuda and Caratinga Fields: Development Strategy and Main Reservoir Management Issues

机译:堡垒盆地的堡垒盆地博物馆和凯明塔领域:发展战略和主要水库管理问题

获取原文

摘要

Barracuda and Caratinga fields, with 1.1 GBOE reserves, are one of the main deep-water discoveries of the late 80’s and early 90’s in Campos Basin, southeast of Brazil. At that time, as it is nowadays, the economic feasibility of deep-water development projects was very much dependent on the high productivity of the wells. In despite of the quite good petrophysical properties, the thickness of the reservoirs did not provide enough productivity to make such projects feasible. The horizontal wells technology came over to improve productivity indexes, making possible the development of these giant fields. The high quality of the seismic data would help the positioning and the geosteering of the horizontal wells. The reservoirs of the fields are sandstone turbidites and have quite distinct depositional styles and structural features. Hence, different well patterns and completion strategy were used for each one. The reserves will be produced by 32 wells and, to maintain the reservoir pressure, 22 water injection wells will be used. To reduce the reservoir uncertainty, a production anticipation project -Pilot Project- was planned. Eleven exploratory wells were completed on the main reservoir units and blocks. These would permit the observation of the reservoir behavior and the checking of the reservoirs hydraulic compartmentalization, once the development wells were drilled. At the end of the Drilling Phase, the results are honouring the project initial assumptions. The Original Oil in Place as well as the productivity / injectivity indexes were confirmed. The reservoir pressure dynamic data showed that the assumed hydraulic model to set the development plan was very close to the verified one, regarding the horizontal and vertical connectivities. This paper focuses on the key factors that enabled a successful project implementation and on the strategy used for the reservoir development of these deep-water offshore fields.
机译:Barracuda和Caratinga Fields,拥有1.1 Gboe储备,是巴西东南80年代末期和90年代初期的主要深水发现之一。当时,如今,深水开发项目的经济可行性非常依赖于井的高生产率。尽管岩石物理特性具有相当好,但储层的厚度没有提供足够的生产率,以使这些项目可行。水平井技术过度来提高生产力指数,使得这些巨型田地的发展成为可能。高质量的地震数据将有助于定位和水平孔的地统治。该领域的储存器是砂岩浊磁带,具有相当明显的沉积风格和结构特征。因此,每个人使用不同的井模式和完成策略。储备将由32个井生产,并保持水库压力,将使用22个注水孔。为了减少水库不确定性,计划预期项目 - 计划。在主储层单位和块上完成了11个探索性井。一旦钻井井,这些将允许观察储层行为和储层液压室的检查。在钻井阶段结束时,结果正在尊重项目初步假设。确认原油以及生产力/注射指数。储层压力动态数据显示假设的液压模型设置开发计划非常接近验证的,关于水平和垂直连接。本文重点介绍了能够成功完成项目实施以及用于这些深水海上田地水库开发的策略的关键因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号