首页> 外文会议>Electric Utility Deregulation, Restructuring and Power Technologies, 2004. (DRPT 2004). Proceedings of the 2004 IEEE International Conference on >Rehabilitation and upgrading of 400 kV substations in order to interconnect the Romanian power system to the union for the coordination of transmission of electricity (U.C.T.E.)
【24h】

Rehabilitation and upgrading of 400 kV substations in order to interconnect the Romanian power system to the union for the coordination of transmission of electricity (U.C.T.E.)

机译:修复和升级400 kV变电站,以将罗马尼亚电力系统与工会联系起来,以协调输电(U.C.T.E.)

获取原文

摘要

The paper shows an interesting case of three 400 kV substations, ones of the most important and great substations of the Romanian power system called Portile de Fier, Tantareni and Urechesti. The strategic task of the Romanian Transmission Electricity Company - TRANSELECTRICA - is to perform in the next years (2002-2005) the interconnection of the Romanian power system to the western European countries system, well known as union for the coordination of transmission of electricity-U.C.T.E. This task is to be realized in order to increase the static and dynamic stability, and to increase the reliability of the Romanian power system. In the year of 1996 was approved by the Romanian government a loan from the European bank for reconstruction and development for acquisition of modern equipment for these substations, such as: circuit breakers, disconnectors, instrument transformers, surge arresters, post type insulators, string insulators, batteries, battery chargers, protection, control and operating systems, telecommunication systems, etc. The paper shows the problems related to the criteria for choosing the new equipment, its technical specifications, and the works of replacing the old equipment with the new existing one. All the works is to be done considering that these substations must be in function, during the whole period of rehabilitation and upgrading.
机译:本文展示了一个有趣的案例,其中包含三个400 kV变电站,这是罗马尼亚电力系统中最重要和最重要的变电站,分别是Portile de Fier,Tantareni和Urechesti。罗马尼亚输电公司(TRANSELECTRICA)的战略任务是在未来几年(2002-2005年)内完成罗马尼亚电力系统与西欧国家系统的互连,该系统被称为协调输电的联盟,加州理工学院为了增加静态和动态稳定性,并提高罗马尼亚电力系统的可靠性,必须完成该任务。罗马尼亚政府于1996年批准从欧洲银行获得一笔贷款,用于重建和开发这些变电站的现代化设备,例如:断路器,隔离开关,仪表变压器,避雷器,接线柱式绝缘子,串式绝缘子,电池,充电器,保护,控制和操作系统,电信系统等。本文显示了与选择新设备的标准,技术规格以及用新旧设备替换旧设备的工作有关的问题。 。考虑到这些变电站在整个修复和升级过程中都必须处于运行状态,因此需要进行所有工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号