REHABILITATION AND UPGRADING OF 400 kV SUBSTATION IN ORDER TO INTERCONNECT THE ROMANIAN POWER SYSTEM TO THE UNION FOR THE COORDINATION OF TRANSMISSION OF ELECTRICITY (U.C.T.E.)

机译:为了协调罗马尼亚的电力传输,对400 kV变电站进行改造和升级,以将罗马尼亚电力系统与联盟互连(U.C.T.E.)

获取原文
获取原文并翻译 | 示例

摘要

The paper shows an interesting case of three 400 kV substations, ones of the most important and great substations of the Romanian Power System called Portile de Fier, Tantareni and Urechesti. The 400 kV substation Portile de Fier is near the Danube River at the border with Serbia, were between year 1965 and 1970 was built a big hydroelectric power plant. This hydroelectric power plant is consisting of 6 generating sets of 175 MW each, which means a disposable electric power of 1050 MW. The hydroelectric power plant and its substation are working since 1971.rnThe substations Tantareni and Urechesti are near the thermoelectric power plant Turceni, and respectively, Rovinari. These thermoelectric power plant are consisting of 7, and respectively, 4 generating sets of 330 MW each. These substations are working since 1978, and respectively 1972. The strategic task of the Romanian Transmission Electricity Company - TRANSELECTRICA - is to perform the interconnection of the Romanian Power System to the western European countries system (accomplished in 2004), well known as U.C.T.E. This task is to be realized in order to increase the static and dynamic stability, and to increase the reliability of the Romanian Power System. In the year of 1996 was approved by the Romanian Government a loan from the European Bank for Reconstruction and Development for acquisition of modern equipment for these substations, such as : circuit breakers, disconnectors, instrument transformers, surge arresters, post type insulators, string insulators, batteries, battery chargers, protection, control and operating systems, telecommunication systems, etc.rnThe paper shows the problems related to the criteria for choosing the new equipment, its technical specifications, and the works of replacing the old equipment with the new existing one. All the works is to be done considering that these substations must be in function, during the whole period of rehabilitation and upgrading.
机译:本文展示了一个有趣的案例,其中包含三个400 kV变电站,这是罗马尼亚电力系统中最重要和最重要的变电站,分别称为Portile de Fier,Tantareni和Urechesti。 400 kV变电站Portile de Fier靠近塞尔维亚边境的多瑙河,建于1965年至1970年之间,是一座大型水力发电厂。该水力发电厂由6台每台175 MW的发电机组组成,这意味着1050 MW的一次性电力。自1971年以来,该水力发电厂及其变电站就开始运行。坦塔雷尼(Tantareni)和乌雷切斯蒂(Urechesti)变电站分别位于火力发电厂Turceni和罗维纳里(Rovinari)附近。这些热电厂分别由7台和4台330兆瓦的发电机组组成。这些变电站分别于1978年和1972年开始工作。罗马尼亚输电公司(TRANSELECTRICA)的战略任务是执行罗马尼亚电力系统与西欧国家系统的互连(2004年完成),众所周知,该系统是U.C.T.E.。为了增加静态和动态稳定性并提高罗马尼亚电力系统的可靠性,必须完成该任务。罗马尼亚政府于1996年批准了欧洲复兴开发银行的贷款,用于购置这些变电站的现代化设备,例如:断路器,隔离开关,仪表变压器,避雷器,接线柱式绝缘子,串式绝缘子,电池,充电器,保护,控制和操作系统,电信系统等。本文展示了与选择新设备的标准,技术规格以及用新旧设备替换旧设备有关的问题。 。考虑到这些变电站在整个修复和升级过程中都必须处于运行状态,因此需要进行所有工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号