首页> 外文期刊>Transmission & Distribution World: The Information Leader Serving the Worldwide Power-Delivery Industry >Utility retrofits towers to increase system voltage: union Fenosa uses existing structures for 66-kV to 220-kV transmission line upgrade
【24h】

Utility retrofits towers to increase system voltage: union Fenosa uses existing structures for 66-kV to 220-kV transmission line upgrade

机译:公用事业公司对塔进行了改造,以提高系统电压:Union Fenosa使用现有结构对66kV至220kV输电线路进行升级

获取原文
获取原文并翻译 | 示例
       

摘要

Recently, Spain's Galicia Region has experienced spectacular growth in power-generation capacity, particularly in the sector of wind generation. As a result, consumers in this region are changing their role to power producers and exporters-a situation that has lead to the reversal of power flows in the existing high-voltage (HV) system. This effect is most noticeable in the northwest zone in the Spanish province of La Coruna, where the installation of an additional 244.2 MVA of wind and gas-fired cogeneration projects offering fixed-price energy to the utility has overloaded Union Fenosa's (UF) existing 66-kV distribution system. To provide a HV system able to export the planned two-phase increase in generating capacity, the utility had to redesign and increase the capacity of the existing system to provide an export capability of 631.4 MVA.
机译:最近,西班牙的加利西亚地区的发电能力出现了惊人的增长,特别是在风力发电领域。结果,该地区的消费者正在改变他们对电力生产商和出口商的作用,这种情况导致了现有高压(HV)系统中电流的逆转。这种影响在西班牙拉科鲁尼亚省的西北地区最为明显,该地区另外安装了244.2兆伏安的风能和燃气热电联产项目,为公用事业提供固定价格的能源,这使联合费诺萨(UF)现有的66超载-kV配电系统。为了提供能够输出计划的两阶段发电量增加的高压系统,公用事业公司必须重新设计并增加现有系统的容量,以提供631.4 MVA的输出能力。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号