首页> 外文会议>Fusion Engineering, 2003. 20th IEEE/NPSS Symposium on >Test of KSTAR ICRF components for long-pulse operation
【24h】

Test of KSTAR ICRF components for long-pulse operation

机译:KSTAR ICRF组件用于长脉冲操作的测试

获取原文

摘要

The high power ICRF components have been developed for long pulse operation of KSTAR tokamak, A water-cooled, high power density (/spl sim/ 10 MW/m/sup 2/) ICRF antenna, a water-cooled co-axial transmission line with the special connector for water sealing while maintaining electrical contact, a vacuum feedthrough for transmission of 1 MW RF power which has two alumina (Al/sub 2/O/sub 3/, 97%) ceramic cylinders and O-ring seal, and a phase shifter using liquid instead of gas for insulating dielectric medium have been developed. RF tests for these components show that stable operation is possible with the peak voltage over 30 kV for long pulse up to 300 seconds.
机译:高功率ICRF组件已开发用于KSTAR tokamak的长脉冲操作,水冷高功率密度(/ spl sim / 10 MW / m / sup 2 /)ICRF天线,水冷同轴传输线带有用于水封同时保持电接触的特殊连接器,用于传输1 MW射频功率的真空馈通,该馈通具有两个氧化铝(Al / sub 2 / O / sub 3 /,97%)陶瓷圆柱体和O形圈密封,以及已经开发出使用液体而不是气体来绝缘电介质的移相器。对这些组件的RF测试表明,峰值电压超过30 kV的情况下,长达300秒的长脉冲可能会实现稳定的运行。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号