The author covers the quality assurance and quality control exercised during the construction of three thermal power units of Tata Electric Cos., constructed in Mumbai, India. Nearly 250,000 cubic meters of concrete were produced under controlled condition between the years 1979 to 1994. Besides setting up strong quality control (QC) and quality assurance (QA) departments the management of Tata Electric Cos had the wisdom and foresight to procure computerised concrete batching and mixing plant, concrete pumps, transit mixers and concrete placing equipment. This was the first time state of the art equipments were deployed in India to produce good quality concrete with speed and economy. The in-house ready mixed concrete concept was developed and successfully implemented. It can be concluded that QC/QA programme played an important role in successful implementation of the Project. The use of modern construction equipment further assisted in completion of the project on time without sacrificing quality and economy.
机译:作者涵盖了在印度孟买建造的塔塔电气COS的三个热电机单元中进行的质量保证和质量控制。在1979年至1994年之间的受控条件下产生了近25万立方米的混凝土。除了建立强大的质量控制(QC)和质量保证(QA)部门,塔塔电气COS的管理有智慧和远见才能采购计算机化的混凝土批量和混合厂,混凝土泵,运输搅拌机和混凝土放置设备。这是最初的艺术设备在印度部署了速度和经济的优质混凝土。内部准备好混合具体概念开发并成功实施。可以得出结论,QC / QA计划在成功实施项目方面发挥着重要作用。使用现代建筑设备进一步协助完成项目,而不牺牲质量和经济。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号