首页> 外文会议>International conference on utilizing ready mix concrete and mortar >Quality ocntrol of concrete works for thermal power station
【24h】

Quality ocntrol of concrete works for thermal power station

机译:火力发电厂混凝土工程质量控制

获取原文

摘要

The author covers the quality assurance and quality control exercised during the construction of three thermal power units of Tata Electric Cos., constructed in Mumbai, India. Nearly 250,000 cubic meters of concrete were produced under controlled condition between the years 1979 to 1994. Besides setting up strong quality control (QC) and quality assurance (QA) departments the management of Tata Electric Cos had the wisdom and foresight to procure computerised concrete batching and mixing plant, concrete pumps, transit mixers and concrete placing equipment. This was the first time state of the art equipments were deployed in India to produce good quality concrete with speed and economy. The in-house ready mixed concrete concept was developed and successfully implemented. It can be concluded that QC/QA programme played an important role in successful implementation of the Project. The use of modern construction equipment further assisted in completion of the project on time without sacrificing quality and economy.
机译:作者介绍了在印度孟买建造的塔塔电气公司的三个火力发电机组的建造过程中所进行的质量保证和质量控制。在1979年至1994年之间,在受控条件下生产了将近25万立方米的混凝土。塔塔电气公司的管理层除了建立强大的质量控制(QC)和质量保证(QA)部门外,还具有智慧和远见卓识,可以采购计算机化的混凝土配料搅拌设备,混凝土泵,运输搅拌机和混凝土浇筑设备。这是印度首次部署最先进的设备,以快速,经济的方式生产高质量的混凝土。内部预拌混凝土的概念得以开发并成功实施。可以得出结论,质量控制/质量保证计划在项目的成功实施中发挥了重要作用。使用现代建筑设备还有助于在不牺牲质量和经济性的前提下按时完成项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号