首页> 外文会议> >Ecological Engineering Alternatives for Remediation and Restoration of A Drastically Disturbed Landscape
【24h】

Ecological Engineering Alternatives for Remediation and Restoration of A Drastically Disturbed Landscape

机译:修复和恢复严重受干扰景观的生态工程替代方案

获取原文

摘要

Ecological engineering or ecotechnology is defined as the design of sustainable ecosystems that integrate human society with its natural environment for the benefit of both. It is an emerging discipline that utilizes natural ecosystem-scale ecological and biogeochemical processes to help solve human-caused environmental problems. the approach applies a systems perspective based on the premise that sustainable solutions require working with natural processes, not against them. As part of a Fall 1998 Environmental Science graduate seminar in "Ecological Engineering" at the University of Oklahoma, students were asked to submit a proposal for the holistic and sustainable restoration of the Tar Creek Superfund Site, Ottawa county, Oklahoma. The Tar Creek site is a portion of an abandoned lead and zinc mining area known as the Tri-State Mining District (OK, KS and MO) and includes approximately exist in the underground voids. In 1979, acidic, metal-rich waters (pH 3.6-5.7, 80 Pb/L, 154,000 ug Zn/L, 80 ug Cd/L and 331,000 ug Fe/L) began to discharge into Tar Creek from natural springs, bore holes and mine shafts. In addition, approximately 37 million cubic meters of processed mine waste materials (chat) litter the surface in large piles. In general, the chat contains 750 mg Pb/kg; 8,300 mg Zn/kg; and 46 mg Cd/kg. Approximately 324 hectares of contaminated tailings settling ponds also exist on site. the site was listed on the National Priorities List (NPL) 1983 and currently receives a Hazard Ranking System (HRS) score of 58.15, making Tar Creek the nation's number one NPL site. Student submitted proposals addressed the following four subject areas: passive treatment options for stream water quality improvement, surface reclamation and revegetation, stream habitat restoration and joint ecological and economic sustainability. Proposed designs for passive treatment of the contaminated mine drainage included unique constructed wetland designs that relied on a combination of biological and geochemical processes, use of microbial mats for luxury metal uptake, enhanced iron oxidation via windmill-based aeration and fly ash injection. Proposed surface reclamation methods included minimal regrading followed by biosolid, ash and other organic amendment applications and several phytoremediation techniques, especially the use of hyperaccumulators. The stream and riparian restoration portion of the proposals focused on chat removal, phytoremediation and species reintroducton. Proposed joint ecological and economic sustainability ventures included development of recreational facilities, mining-based tourism and an Ecotechnology Research Park.
机译:生态工程或生态技术的定义是将人类社会与其自然环境融为一体的可持续生态系统设计。它是一门新兴学科,它利用自然生态系统规模的生态和生物地球化学过程来帮助解决人为引起的环境问题。该方法基于系统的观点,前提是可持续解决方案需要使用自然过程,而不是违背自然过程。作为俄克拉荷马大学“生态工程” 1998年秋季环境科学研究生研讨会的一部分,学生被要求提交一份关于俄克拉荷马州渥太华县Tar Creek超级基金站点的整体和可持续性恢复的建议。 Tar Creek场址是废弃的铅锌矿区的一部分,被称为三州采矿区(俄克拉何马州,堪萨斯州和密苏里州),并且大约存在于地下空隙中。 1979年,酸性,富含金属的水(pH 3.6-5.7、80 Pb / L,154,000 ug Zn / L,80 ug Cd / L和331,000 ug Fe / L)开始从天然泉水,钻孔排入塔尔克里克(Tar Creek)。和矿井。此外,大约有3700万立方米的矿山废料(闲聊)散落在大堆表面。通常,聊天包含750 mg Pb / kg; 8,300毫克锌/千克;和46 mg Cd / kg。现场还存在约324公顷受污染的尾矿沉降池。该站点在1983年被列为国家优先重点列表(NPL),目前获得的危险等级系统(HRS)得分为58.15,使Tar Creek成为该国排名第一的站点。学生提交的提案涉及以下四个主题领域:溪流水质改善的被动处理方案,地表开垦和植被恢复,溪流栖息地恢复以及共同的生态和经济可持续性。被动处理受污染的矿井排水的拟议设计包括独特的人工湿地设计,该设计依赖于生物和地球化学过程的结合,使用微生物垫来吸收豪华金属,通过基于风车的曝气和粉煤灰喷射增强铁的氧化。提议的表面开垦方法包括最小程度的降解,其次是生物固体,灰分和其他有机改性剂的应用,以及几种植物修复技术,尤其是使用超级蓄积剂。提案的流域和河岸恢复部分集中在聊天删除,植物修复和物种重新引入上。拟议中的生态和经济可持续性合资企业包括休闲设施的开发,以采矿为基础​​的旅游业和生态技术研究园。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号