首页> 外文会议>Annual review of progress in quantitative nondestructive evaluation >Shape estimation of deffects on steam generator tubes
【24h】

Shape estimation of deffects on steam generator tubes

机译:蒸汽发生器管上缺陷的形状估计

获取原文

摘要

Most of the nuclear power plants (NPPs) now in service in Japan are based on either of two reactor technologies-PWR and BWR. While the PWR plant requires steam generators (SG), the BWR plant needs no separate SG because of its capability of the PWR plant larger than that of the BWR plant, while on the other, separate SG installation offers an advantage in that the controlled area in the PWR plant can be limited, resulting in easier plant maintenance, compared with the BWR plant. Accordingly SG maintenance to preclude radioactive substances from flowing out into the secondary system is one of the most important tasks in operating PWR plants.
机译:目前在日本投入使用的大多数核电站都基于两种反应堆技术-PWR和BWR中的一种。尽管PWR工厂需要蒸汽发生器(SG),但BWR工厂不需要单独的SG,因为PWR工厂的能力大于BWR工厂的能力,而另一方面,单独的SG安装具有以下优势:可控区域与BWR电厂相比,PWR电厂中的设备可能受到限制,从而使工厂维护更容易。因此,SG维护以防止放射性物质流入二次系统是操作PWR工厂中最重要的任务之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号